The Hills of Mount Carmel Estate Bridges
Principal Contractor: Western Earthmoving Pty Ltd
Client: Mogul Stud Pty Ltd / Jundu Pty Ltd
Contract Type: Subcontract Purchase Order
Approximate Value: $4.5 million
Completion Date: August 2019
Details: Box Hill Stage 1 and Stage 2 Bridges are over-water structures along Mount Carmel Drive in the new Hills of Mount Carmel residential development. Stage 1 Bridge is 3-span and 57m long, Stage 2 Bridge is 3-span and 60m long. Both bridges are cast in situ 1-lane 2-way structures with separate cycleway and pedestrian walkway access. The bridge is of B3 technical complexity, grade-2 high-risk work, with moderate stakeholder arrangements.
Technical Considerations:
Superstructure with Simply Supported Girders
Service Channels and Conduit ‘block-outs’
Moderate Stakeholder Interfacing
Moderately Complex Movement Joints
High-grade Powder Coating Finishes
Consultant Team Coordination